PROJECTS

Projects for the solar photovoltaic industry

Finis Terrae. This photovoltaic park is located in the municipality of María Elena, in the Antofagasta region, approximately 1,300 km north of Santiago. It has an installed capacity of 160 MW and can generate more than 400 GWh per year, equivalent to the annual consumption needs of some 198,000 homes, thus avoiding the emission into the atmosphere of more than 198,000 tons of CO2 per year.

Bolero West. It is a photovoltaic plant installed in Chile with an installed capacity of 86 MW with 288,266 panels. The project was divided into two annexed plants (Bolero Este and Bolero Oeste) to be developed simultaneously. The intervention of Lamaignere was in the phase corresponding to Bolero Oeste.

Ruby Project. Located in Moquegua (Peru), it is the largest solar generation plant in the country, with an installed capacity of 180 MW (in direct current). It will have the capacity to generate approximately 440 GWh, equivalent to the annual consumption needs of approximately 351,000 Peruvian homes.

Villanueva Project. The Villanueva plant of 754 MW [1] is classified as the largest photovoltaic solar power plant under construction in the Americas. It is located in Viesca, in the state of Coahuila (Mexico).

Some highlights of all these projects:

  • More than 1200 TEUs for all these projects.
  • Export of containers managed by several Lamaignere offices: Spain, Mexico and Chile.
  • Document management
  • Coordination from origin until the release of cargo at destination.

< Back to projects

CERTIFICATES AND ACCREDITATION

certificados
subvenciones

Lamaignere,S.A. empresa acogida al Programa de Incentivos para el Fomento de la Innovación y el Desarrollo Empresarial en Andalucía